– Project has been awarded to United Pavement Maintenance, Inc.
Work on the project includes, but is not limited to, furnishing all labor, materials, equipment, transportation, and incidentals necessary for bicycle and pedestrian improvements along with pavement rehabilitation including installing new curb, gutter, sidewalk, bicycle path, median island, rapid flashing beacon system, crosswalks, and pavement resurfacing and all other work included on the plans.
- Project has been awarded to Sinclair General Engineering Construction, Inc.
Work on the project includes, but is not limited to, furnishing all labor, materials, equipment, transportation, and incidentals necessary for, asphalt removal & paving, curb, gutter, sidewalk, vertical rock drains (drywells), catch basins, striping, traffic control, and all other work included on the plans.
– Project has been awarded to Hensley’s Paving & General Engineering, Inc.
Due to weather the micro slurry seal portion of the contract has been postponed till spring.
Work on the project includes, but is not limited to, furnishing all labor, materials, equipment, transportation, and incidentals necessary for, utility potholing, asphalt grinding, sub-base removal, & paving, curb, gutter, sidewalk, striping, traffic control, and all other work included on the plans.
– Project has been awarded to DSS Company dba Knife River Construction.
Work on the project includes, but is not limited to, furnishing all labor, materials, equipment, transportation, and incidentals necessary for, asphalt grinding & paving, micro-surfacing, striping, traffic control and all other work included on the plans.
– Project has been awarded to Consolidated Engineering Inc.
Work on the project includes, but is not limited to, furnishing all labor, materials, equipment, transportation, and incidentals necessary for, utility potholing, asphalt grinding, sub-base removal, paving, micro-surfacing, curb, gutter, sidewalk, striping, traffic control, and all other work included on the plans.